India will have the highest railway bridge in the world by 2016, over the river Chenab.
Northern Railway has taken several measures for the people stranded in flood-ravaged Jammu and Kashmir, like running special trains from Katra, Udhampur and Jammu to different parts of the country and attaching extra coaches to regular services.
After remaining disrupted for 11 days, Railways today partially resumed train services in Kashmir Valley following restoration of tracks damaged by flood waters.
These railway bridges are truly engineering marvels.
Veerander Singh had a verbal duel with company commander Inspector Snoop following which he opened fire at him and another jawan identified as Parveen Kumar near the cave shrine, leaving both of them in a critical condition, DIG (Reasi Udhampur Range) Alok Puri told PTI. The jawan later committed suicide by shooting himself with the self loading rifle, he added.
A senior police officer told rediff.com that the mishap occurred when the driver lost control of the bus, which was on its way to Udhampur from Katra.
Security has been beefed up in and around the Vaishnodevi Devi shrine in Trikuta hills following the recovery of a pen bomb from the premises, police said on Friday.
Following the massive fire that spread to several areas, the Shri Mata Vaishno Devi Shrine Board requested the Air Force to help douse the fire.
Every week, we bring you fascinating videos, chosen by you, through your likes.
The massive arch-shaped 1.315-km long 'engineering marvel', designed to withstand wind speeds of up to 260 km per hour, will rise 359 m above the river bed.
36 Union ministers will visit different districts in both the divisions of the Union Territory starting from January 18 to January 24 and the home ministry is coordinating it, the sources said.
The 1.3-kilometre-long bridge aims to boost connectivity to the Kashmir Valley and it is being constructed at a cost of Rs 1,486 crore as part of the Udhampur-Srinagar-Baramulla Railway Link project
12 security personnel, including three officers, were also injured in the operation at Reasi.
The project holds strategic significance as Zojila Pass is situated at an altitude of 11,578 feet on the Srinagar-Kargil-Leh National Highway and remains closed during winters due to heavy snowfall.
Restoration of road and tele-communication network in the Kashmir Valley, ravaged by floods, will take three to five days. The Centre has directed free flow of transport via Manali and Leh to Srinagar, the only available surface network, a top central government official said on Monday.